A power outage in the server room can have disastrous consequences. We specialize in testing sensitive IT infrastructures and carry out highly precise measurements during live operation. This allows us to detect fault currents in time. Inspection without switching off is possible in many cases – we clarify this in the preliminary consultation.

Testing of Servers and IT Infrastructure in Accordance with DGUV V3 – During Live Operation Wherever Possible
Server landscapes and data centers form the central nervous system of your company, and any outage leads directly to significant financial losses and data loss. 24/7 continuous operation places enormous strain on power supplies and peripheral devices, making thermal risks and gradual insulation faults a latent threat to overall IT security. As an operator, under the German Ordinance on Industrial Safety and Health (BetrSichV), you are obliged to provide complete proof of the electrical safety of this business-critical infrastructure. If a legally defensible test report is missing in the event of damage, you risk losing insurance coverage as well as personal liability for management. Bittermann Elektrotechnik GmbH guarantees you maximum legal certainty—with as little impact on your system availability as possible.
Our Testing Services in Detail
As certified experts, we inspect your IT infrastructure strictly in accordance with DIN EN 50678/50699 for plug-in components and DIN VDE 0105-100 for fixed racks and distribution boards. Since shutting down productive systems is usually not an option, we use highly specialized, non-invasive measurement methods such as residual current measurement directly during live operation. In many cases, this allows us to validate leakage currents, power quality, and UPS systems without network interruptions or performance losses – what is possible in your environment is something we clarify in the preliminary consultation. You receive audit-proof documentation compliant with TRBS, which will stand up to any IT audit and provides a reliable basis for your risk assessment pursuant to Section 3 of the BetrSichV.
What We Inspect in Data Centers and Server Rooms
Main low-voltage distribution and sub-distribution boards: stationary installation under DIN VDE 0105-100 – visual inspection, protective conductors, insulation resistance, loop impedance and residual current devices
UPS systems and their integration into the distribution
Rack power distribution units (PDUs) and power strips in the rack
Connection and IEC power cords as portable equipment
Servers, switches, storage systems and monitors as plug-in components under DIN EN 50678 or DIN EN 50699
Workplace IT: computers, monitors, printers and power supplies in offices and technical rooms
How We Test During Live Operation
Preliminary consultation: We clarify redundancies (e.g. A/B power feeds, redundant power supplies), maintenance windows, access rules and contact persons. Inspection without switching off is possible in many cases – in this step we jointly determine which components can be tested during operation.
Inventory: Recording of distribution boards, racks, PDUs and devices as the basis for the inspection plan and intervals.
Visual inspection: Cables, plugs, strain relief, routing and the loading of power strips.
Measurement during operation: Using residual current measurement, we determine protective conductor and leakage currents while the devices keep running. With redundant power supplies, the supply paths are tested one after the other so that the system remains powered via the other path.
Test steps requiring disconnection: Measurements that require disconnection from the mains – such as insulation measurements on fixed circuits – are grouped into agreed maintenance windows, in the evening, at night or at weekends if desired.
Documentation: Audit-proof inspection report with an assessment of defects and a reminder of the next inspection due.
Special Features of IT Infrastructure
Accumulated leakage currents: Every power supply discharges a small current via the protective conductor. Many devices on one circuit can together trip a residual current device. The measurement shows where loads should be better distributed.
High packing density: Densely populated racks and power strips heat up more; loose or overloaded plug connections are a typical inspection finding.
Inspection intervals: The guideline values of DGUV Regulation 3 are 6 months for portable equipment (in offices up to 2 years if the defect rate is below 2 %) and 4 years for stationary installations. The risk assessment is decisive.
Continuous monitoring: For stationary installations, the implementation instructions to DGUV Regulation 3 also permit continuous monitoring by qualified electricians – for example in combination with measurement-based monitoring such as residual current monitoring. Whether this is an option for your data center depends on the risk assessment.
Why Bittermann Testing Technology?
Certified Experts: We inspect your highly sensitive IT with the expertise of certified assessors (BDSH e.V.) at engineering level rather than using simple standard methods.
Maximum Availability: Through innovative residual current measurement methods, we test servers, switches, and storage systems during live operation. Inspection without any shutdown is possible in many cases – we clarify this in the preliminary consultation.
Court-Admissible Legal Certainty: Our seamless logs in accordance with DGUV and TRBS fully protect your management in the event of a claim against insurers and regulatory authorities.
Holistic Data Center Assessment: We evaluate the entire electrical chain—from the main low-voltage distribution board through the UPS to the PDU in the rack—for maximum fail-safety.
Secure Your Systems Now
Protect your critical IT infrastructure and minimize your liability risk with true experts. Contact us today for a no-obligation initial consultation about a custom testing concept for your data center that avoids shutdowns as far as possible.
Quick request
Request a quote for IT infrastructure inspection
A few key details are all we need. After a brief preliminary consultation, you will receive a fixed-price quote from us.
Your contact person

Dirk Lehmhaus
Project Manager, VEFK & BDSH e.V. Certified Expert
FAQ
Frequently asked questions.
Can servers be inspected during operation?
Which standards apply to the inspection of IT infrastructure?
What is differential current measurement?
What do you inspect in data centers and server rooms?
Why do residual current circuit breakers sometimes trip in server rooms?
How often does IT infrastructure have to be inspected?
Do you also inspect at night or on weekends?
Our Services
Additional legally compliant testing services